Dixon Homes, Inc.
our home page
Golf Course Residence
progress through 14 December, 2007
Powder Room (drum not yet cut to lower sink)
(14 December, 2007)
Powder Room
(14 December, 2007)
Bath 2
(14 December, 2007)
Bath 2 Sink
(14 December, 2007)
Typical Interior Door Hardware Handle
(14 December, 2007)
Master Bath (hand spray bar not hooked up yet)
(14 December, 2007)
Typical Bronze Light Trim in Cedar Ceilings
(14 December, 2007)
Master Ceiling
(14 December, 2007)
Shower Trim at Loft (Tile not yet grouted)
(14 December, 2007)
Loft Sink Cut-out
(14 December, 2007)
Dryer Vent Hookup at Laundry
(14 December, 2007)
Bath 3
(14 December, 2007)
Bath 3
(14 December, 2007)
Bath 3
(14 December, 2007)
Bath 3
(14 December, 2007)
Bath 3
(14 December, 2007)
Bath 3 Tub
(14 December, 2007)
Bed 3 Ceiling (Red Plastic covers the Smoke Detectors on ceilings)
(14 December, 2007)
Office
(14 December, 2007)
Outside Shower
(14 December, 2007)
Deck by Master Suite
(12 December, 2007)
Rear Deck
(12 December, 2007)
Deck by Dining Bay
(12 December, 2007)
Kitchen
(12 December, 2007)
South Walkway
(12 December, 2007)
Entry
(12 December, 2007)
Previous photos
through November 28, 2007
through October 9, 2007
through August 24, 2007
through June 20, 2007
through May 7, 2007
through March 8, 2007
through December 26, 2006
through October 25, 2006
through September 20, 2006
through July 18, 2006
through June 15, 2006
through April 27, 2006
through April 3, 2006
through December 27, 2005