Golf Course Residence
progress through 15 June, 2006
Foundation Prep
Underground Plumbing Installed, Inspected and Backfilled
Reinforcement Steel Install in Progress
(June 15, 2006)
Corner of Garage
(June 15, 2006)
Bed 3, Bath 3 and Kitchen beyond
(June 15, 2006)
Living Room and Master Suite
(June 15, 2006)
Living Room
(June 15, 2006)
Entry Hall
(June 15, 2006)
Dining Bay
(June 15, 2006)
Kitchen
(June 15, 2006)
Kitchen
(June 15, 2006)
Kitchen / Living
(June 15, 2006)
Pool Deck
(June 15, 2006)
Cleanout by Bath 3
(June 15, 2006)
Garage Formed - Ready for Layout Inspection
(May 25, 2006)
Garage Formed - White Line Beyond for Plumbing Trenching
(May 25, 2006)
Garage Formed
(May 25, 2006)
Garage
(May 24, 2006)
Garage
(May 24, 2006)
Bed and Bath 3 in Foreground, Kitchen Beyond
(May 24, 2006)
Kitchen Bay
(May 24, 2006)
Side Yard Area next to Kitchen Bay
(May 24, 2006)
Dining Bay
(May 24, 2006)
Pool Next to Dining
(May 24, 2006)
House from Corner of Pool Deck
(May 24, 2006)
Side Yard from Corner of Pool Deck
(May 24, 2006)
Garage Area
(May 24, 2006)
Drain, Gas, Electric and Water Lines Installed in North Property Line
String lines installed for Concrete Forms
Orange Stake in Foreground is Garage Corner
Green Pipes with White Caps are Drainline Connections
Copper Pipe is Water to Pool Room
Yellow Pipes are for Propane Gas
(May 17, 2006)
Surveyor's Re-established Building Corners
Stake in Photo is Corner of Bedroom 3, Truck is in Kitchen
(May 17, 2006)
White Pipe is Sewer Connection and Cleanout
Grey Pipes are Electrical
(May 17, 2006)
Drainage Connection for Pool Deck
(May 17, 2006)
Yellow Pipe is Gas Line from Street to Pool and Pool to BBQ Area
(May 17, 2006)
Neighbor's Rock Wall that is much higher than 5' across street
Landscape covers lower portion of wall
(May 17, 2006)
Garage Area
(May 17, 2006)
Common Area Landscape by South Side of Trough
(May 17, 2006)
Common Area Landscape by Pool Room and Trough
(May 17, 2006)
Wall From Street
(May 9, 2006)
Wall from Street
(May 9, 2006)
Backfill at Edge of Pool Trough
(May 9, 2006)
Pool and Trough from Below
(May 9, 2006)
Rear Wall
(May 9, 2006)
From Street Below
(May 9, 2006)
Trough and Pool Edge
(May 9, 2006)
From Street Below
(May 9, 2006)
From Street Below
(May 9, 2006)
Top of Pool Equipment Vault
(May 9, 2006)
At Spa looking Back to House
(May 9, 2006)
Backfill Ready for Landscaping - Corner Wall
(May 9, 2006)
Backfill Ready for Landscaping - Pool Room and Trough
(May 9, 2006)
Hillside Below Pool Room Cleaned up Ready for Landscape
(May 9, 2006)
Pool Equipment Room
(May 9, 2006)
Stairs at Neighbor's Lot
(May 9, 2006)
Lot Cleared Ready for Slab Base and Formwork
(May 9, 2006)
Rock Veneer on Landscape Wall not yet Completed
(May 9, 2006)
Street Side Portion of Lot Cleared
(May 9, 2006)
Small Added Landscape Wall
(May 9, 2006)
Swimming Pool and Spa
(May 9, 2006)
Lot Cleared
(May 9, 2006)
Previous photos
through April 27, 2006
through April 3, 2006
through December 27, 2005