Dixon Homes, Inc.
our home page
Golf Course Residence
progress through 27 April, 2006


Rock Veneer at Pool Trough and Wall
(April 27, 2006)


Rock Veneer at Pool Trough and Wall
(April 27, 2006)


Street Side Wall
(April 27, 2006)


Closeup of Trough
(April 27, 2006)


Looking Down from Pool Above
(April 27, 2006)


Rock Veneer almost Complete at Pool Equip Room
(April 27, 2006)


Side Retaining Wall from Street
(April 19, 2006)


Rock Veneer in Progress
(April 19, 2006)


Close up of Rock Veneer
(April 19, 2006)


Looking Other Direction
(Green Pipes will be Cut Flush)
(April 19, 2006)


Pool Equipment Ceiling Still Curing
Temporary Support Members still in Place
(April 19, 2006)


Pool Equipment Lines Inside Vault
(April 19, 2006)


Rock Veneer In Progress on Pool Walls
(April 19, 2006)


Corner of Retaining Wall / Pool Vault
(April 19, 2006)


Pool Overflow Edge
(April 19, 2006)


Backfill in Progress by Equipment Room
(Equipment/ Retaining Wall Cure Time completed)
(April 19, 2006)


Pool Equipment Room
(April 14, 2006)


Concrete Ceiling for Pool Room
(April 14, 2006)


Pool, Spa and Equipment Room
(April 14, 2006)


Edge of Wall by Neighbor
(April 14, 2006)


Swimming Pool Contractor Connecting Pool and Spa Lines to Equipment Room
(April 14, 2006)


Gravel Fill for Drainage
(April 14, 2006)


Molokai from House Area
(April 14, 2006)


Wall Ready for Stone on Property Line
(April 14, 2006)


View of Lanai in Distance
(April 14, 2006)


Panoramic View from Bench Area on Pool Deck (1 of 4)
(April 7, 2006)


Panoramic View from Bench Area on Pool Deck (2 of 4)
(April 7, 2006)


Panoramic View from Bench Area on Pool Deck (3 of 4)
(April 7, 2006)


Panoramic View from Bench Area on Pool Deck (4 of 4)
(April 7, 2006)


Swimming Pool
(April 7, 2006)


Overflow Trough for Infinity Edge
(April 7, 2006)


Retaining Wall and Pool Vault at Left, Pool at Right
(April 7, 2006)


Infinity Edge Trough
(April 7, 2006)


Infinity Edge Trough
(April 7, 2006)


Street Side Retaining Wall (to receive stone veneer)
(April 7, 2006)


Equipment Vault in Progress
(April 7, 2006)


Neighbor's Stairs
(April 7, 2006)


Backfilling Drainage Rock against Wall
(April 7, 2006)


Pool Deck and House Area
(April 7, 2006)


Street Below
(April 7, 2006)

Previous photos

through April 3, 2006
through December 27, 2005