Golf Course Residence
progress through 27 December, 2005
(December 27, 2005)
(December 27, 2005)
(December 27, 2005)
(December 27, 2005)
(December 27, 2005)
(December 27, 2005)
(November 15, 2005)
(November 15, 2005)
(November 15, 2005)
(November 15, 2005)
(November 15, 2005)
(November 15, 2005)
Compacting Fill Material in Trough Area
(October 20, 2005)
Fill Material to Left, Excavated Soil under Machine
(October 20, 2005)
Pool to the Left, Trough to the Right
(October 20, 2005)
Kapalua Rock Stockpile from Excavation - for Wall Veneer
(October 20, 2005)
Begin Excavation in Trough Area
Engineer Suggested remove 3'
We ended up digging out 8' of wet, clay soil here to reach bedrock
(October 7, 2005)
View from Lot
(October 7, 2005)
(October 7, 2005)
(October 7, 2005)
Engineering Project Delay - May through October 2005
Lot Clearing
(May 5, 2005)
Lot Clearing
(May 5, 2005)
Lot Clearing
(May 5, 2005)
Lot Clearing
(May 5, 2005)
Lot Clearing
(May 5, 2005)
Lot Clearing
(May 5, 2005)
Lot Clearing
(May 5, 2005)
Trees and Shrubs Removed
(April 27, 2005)
Common Area Irrigation Relocated
(April 27, 2005)
Lot Ready for Excavation
(April 27, 2005)
Main Street
(April 27, 2005)
Edge of Pool Excavation
(April 27, 2005)
Red Line for Pool Excavation
(April 27, 2005)
Pool Area
(April 27, 2005)
Street Landscaping
(April 27, 2005)
Street Landscaping
(April 27, 2005)
Common Area Irrigation Relocated
(April 27, 2005)
Water Meter Installed
(April 27, 2005)
Street Utilites
(April 27, 2005)