Dixon Homes, Inc.
our home page
Oceanfront Residence
progress through 9 December, 2005


Entry Stair
(December 9, 2005)


Close up of Entry Stair Pavers
(December 9, 2005)


Planter Areas Added at Sides of Entry Door
(December 9, 2005)


Teak Flooring Installed in Library
(Exposed Floor and Wall Area to Receive Stone)
(December 9, 2005)


Library Fan
(December 9, 2005)


Library TV Cabinet
(December 9, 2005)


Alcove at Upper Hall - What is railing to be here?
(December 9, 2005)


Master Bed Ceiling
(added sticks to lower ceilings)
(December 9, 2005)


Master Bed Doors
(December 9, 2005)


Swimming Pool from Bed Lanai
(December 9, 2005)


Boy's Bedroom
(December 9, 2005)


Girl's Bath
(December 9, 2005)


Entry Door Fixture
(need to make bracket longer for awning windows)
(November 15, 2005)


Master Bath Vanity
(November 15, 2005)


Swimming Pool Stair
(November 15, 2005)


Add Sticks to Master Bed Ceiling
(November 15, 2005)



(November 15, 2005)


Previous photos

through October 24, 2005
through October 14, 2005
through September 22, 2005
through September 12, 2005
through August 16, 2005
through July 7, 2005
through June 27, 2005
through June 9, 2005
through May 26, 2005
through May 6, 2005
through April 8, 2005
through March 24, 2005
through February 17, 2005
through December 31, 2004
through December 8, 2004
through October 29, 2004
through September 3, 2004
through August 12, 2004
through July 6, 2004
through June 25, 2004
through June 10, 2004
through May 25, 2004
through May 12, 2004
through April 7, 2004
through March 31, 2004
through March 12, 2004
through February 12, 2004
through January 16, 2004
through December 24, 2003
through December 8, 2003
through November 13, 2003
through October 31, 2003
through September 25, 2003
through August 15, 2003
through August 7, 2003
through June 25, 2003
through June 5, 2003
through May 21, 2003
through April 11, 2003
through March 4, 2003