Oceanfront Residence
progress through 6 July, 2004
Raised Courtyard / Garden Wall
(July 6, 2004)
Garden Area from Library
(July 6, 2004)
Steps at Entry
(July 6, 2004)
Excavation for Wine Room - Entry from Mechanical
(July 6, 2004)
Excavation for Wine Room - Looking North
A/C unit to left was added for Game Room
(July 6, 2004)
Excavation for Wine Room - Looking South
(July 6, 2004)
Audio / Visual Equipment Area under Alcove
(July 6, 2004)
Gym - Southeast Wall
(July 6, 2004)
Gym - Southwest Wall
(July 6, 2004)
Ocean Lanai Column Backing
(July 6, 2004)
Stairs to Pool from Ocean Lanai
(July 6, 2004)
Lower Deck Area
(July 6, 2004)
Yard Trenched - Waiting for Landscape Plan to Complete
(July 6, 2004)
Master Shower Control Valves and Side Wall Spray Heads
(Far Left Control to Overhead at Center of Shower Ceiling)
(July 6, 2004)
Previous photos
through June 25, 2004
through June 10, 2004
through May 25, 2004
through May 12, 2004
through April 7, 2004
through March 31, 2004
through March 12, 2004
through February 12, 2004
through January 16, 2004
through December 24, 2003
through December 8, 2003
through November 13, 2003
through October 31, 2003
through September 25, 2003
through August 15, 2003
through August 7, 2003
through June 25, 2003
through June 5, 2003
through May 21, 2003
through April 11, 2003
through March 4, 2003