Oceanfront Residence
progress through 10 June, 2004


Entry Courtyard
(June 10, 2004)


Garden Walls going up - Access to Rear Lawn now Restricted
(June 10, 2004)


Footing for Wall between Garden and Cottage
(June 10, 2004)


Entry Stairs
(June 10, 2004)


3 Floor Plugs @ East End of Gym
all to be wired 110V at this time
(June 10, 2004)


Closet in Gym for A/V Equipment
(floor plug to right of arch 110V)
(June 10, 2004)


South Gym Wall
(floor plug to left of arch 110V)
(June 10, 2004)


Home Run for A/V Equipment in Basement under Alcove
(Green wires are for A/V)
(June 10, 2004)


Library Patio - Only One Course Block to be Removed
(June 10, 2004)


Side Yard
(June 10, 2004)


Lawn Area
(June 10, 2004)


Lawn Area
(June 10, 2004)


Lawn Area - Shower now Located at Stake at Right
(June 10, 2004)


Pool Stairs
(June 10, 2004)


Pool and Spa
(June 10, 2004)


Pool Deck
New Shower is Stake at end of Pool
(June 10, 2004)


Framed Area for Subwoofer above Plywood on Floor
(June 10, 2004)


Daughter's Bathroom
(June 10, 2004)


Son's Bathroom
(June 10, 2004)


Master Bath Tub
(June 10, 2004)


Laundry Chute inside His Closet
(June 10, 2004)


Entry to Boy's Room
(typical wood base plugs)
(June 10, 2004)


Steam Shower By Gym
(bench each side, add wing walls and swinging door?)
(Jeff was just asked if we could move the house forward a few feet)
(June 10, 2004)

Previous photos

through May 25, 2004
through May 12, 2004
through April 7, 2004
through March 31, 2004
through March 12, 2004
through February 12, 2004
through January 16, 2004
through December 24, 2003
through December 8, 2003
through November 13, 2003
through October 31, 2003
through September 25, 2003
through August 15, 2003
through August 7, 2003
through June 25, 2003
through June 5, 2003
through May 21, 2003
through April 11, 2003
through March 4, 2003