Oceanfront Residence
progress through 25 June, 2003


Masonry Block in Progress
(June 25, 2003)


Waterproofing in Progress for Outside of Basement
(June 25, 2003)


Wall Footing between Pool and Upper Lawn Area
(June 25, 2003)


From Lawn Area looking Towards Living Room
(June 25, 2003)


Footing for Wall Between Upper Lawn and Lower Side Yard
(June 25, 2003)


Basement Area - Pool Equipment Area in Foreground
(June 25, 2003)


Footing for Library Area Stem Wall - Terrace Pop Out to Upper Right
(June 25, 2003)


Footing for Library Area Stem Wall next to Planter Side
(June 25, 2003)


Baseplates and Templates
(June 25, 2003)


Property Line Wall from Lawn Area
(June 11, 2003)


Swimming Pool from House
(June 11, 2003)


Swimming Pool from Ocean
(June 11, 2003)


Spa and Bench in Deep Area of Pool
(June 11, 2003)


Steps to Shallow End, Rough-in for Speakers
(June 11, 2003)


Property Line Wall
(June 11, 2003)


Basement Foundation Prep - Pool Equipment Area in Foreground
(June 11, 2003)


Another view of Pool Equipment Area
(June 11, 2003)


Property Line Wall Towards Ocean
(June 11, 2003)


Swimming Pool Concrete Placement in Progress
(June 10, 2003)


Swimming Pool Concrete Placement in Progress
(June 10, 2003)


Basement Foundation Forming
(June 10, 2003)

Previous photos

through June 5, 2003
through May 21, 2003
through April 11, 2003
through March 4, 2003