Dixon Homes, Inc.
our home page
Oceanfront Residence
progress through 5 June, 2003
Swimming Pool
(June 5, 2003)
Swimming Pool
(June 5, 2003)
Swimming Pool
(June 5, 2003)
Foundation Prep for Basement
(June 5, 2003)
Property Line Wall Grouted to 6' High
(June 5, 2003)
Property Line Wall Grouted to 6' High
(June 5, 2003)
Property Line Wall Grouted to 6' High
(June 5, 2003)
Swimming Pool Excavation
(May 22, 2003)
Swimming Pool Excavation
(May 22, 2003)
Swimming Pool Excavation
(top of the pink board on wall 6" below finished pool deck)
(May 22, 2003)
Previous photos
through May 21, 2003
through April 11, 2003
through March 4, 2003