progress through 21 May, 2003
Footing Poured
(May 21, 2003)
Footing Poured
(May 21, 2003)
Footing Poured
(May 21, 2003)
Drain set in Basement Area
(May 19, 2003)
Property Line Wall Footing Reinforcement
(May 19, 2003)
Drainage outlets in swale area
(Small from Basement, Medium from Downspouts, Large from Street)
(May 19, 2003)
Basement Area
(April 30, 2003)
Footing Prep (before columns removed)
(April 30, 2003)
Drainline from Street along South Property Line
(April 30, 2003)
Pad prep under basement area
(April 30, 2003)
Excavated Material
(Rocks stockpiled to be hauled away)
(April 30, 2003)
Manhole at South Property Line
(was previously covered and not visable)
(April 30, 2003)