progress through 11 April, 2003
Cottage Area
(April 11, 2003)
Driveway
(April 11, 2003)
24" RCP Drainline Approx 3' away from property line
(April 11, 2003)
Excavation of Basement Area
(Asphalt paving was found, and removed, so is deeper than needed)
(April 11, 2003)
Excavation of Basement Area
(April 11, 2003)
Basement area opposite side
(April 11, 2003)
All large rocks found are stockpiled so can be removed
(April 11, 2003)
Water line to Outdoor Shower Area
(April 11, 2003)
Site Drainage Completed, Begin Foundation Excavation
(April 4, 2003)
Courtyard Area
(April 4, 2003)
Excavation under Kitchen Area
(April 4, 2003)
Library Area
(April 4, 2003)
South Property Corner
(April 4, 2003)
Site Drainage in Progress
(April 1, 2003)
Site Drainage in Progress
(April 1, 2003)
Drainline Excavation (Garage to Left of White Line)
(March 28, 2003)
Drainline Excavation along North Property Line
(March 28, 2003)