Progress Through - 18 December, 2008



Entry Gates and Touchpad Monument In Foreground Left
(December 18, 2008)


Gates Closed
(December 18, 2008)


Touch Pad, Gate Controllers and Cameras on Hillside
(December 18, 2008)


Entry Drive
(December 18, 2008)


Backside of Gates
(December 18, 2008)


Upper Driveway Needs Satin and Sealer
(December 18, 2008)


Equipment Area Behind Bath 4
(December 18, 2008)


Cinder Path by Guest Beds
(December 18, 2008)


Lower Hillside
(December 18, 2008)


Covered Lanai
(December 18, 2008)


Pool Infinity Edge
(December 18, 2008)


Curved Doors Closed
(December 18, 2008)


Fireplace
(December 18, 2008)


Fireplace
(December 18, 2008)


BBQ and Painted Equipment Closet Door
(December 18, 2008)


Pool Lanai
(December 18, 2008)


Handrail to Spa
(I want to add 2 more center support members to stiffen it up)
(December 18, 2008)


Master Bed Lanai and Gate to Garden
(December 18, 2008)


Master Lanai
(December 18, 2008)


Stucco and Rock Work Complete at Master Shower Glass Door, Installing Mondo Grass
(December 18, 2008)


Master Garden Bench
(December 18, 2008)


Mechanical Path at Master Garden
(December 18, 2008)


View of Master Garden from Bathroom Curved Window
(December 18, 2008)


Revised Tilework at Steam Shower TV - Still Need to Grout and Final Clean
(December 18, 2008)


Frame Fabricated, Still Waiting for Glass for Master Vanity Mirror
(December 18, 2008)


Master Bath
(December 18, 2008)


TV Frame Added at Living Room TV
(December 18, 2008)


Hall to Master Suite
(December 18, 2008)


Kitchen, Adjusting Blinds
(December 18, 2008)


Entertainment Room TV Frame and Speakers Set (Waiting for fabric for side speaker grills)
(December 18, 2008)


TV Frame INstalled at Bed 2
(December 18, 2008)


Entry Walkway from Porte Couchere
(December 18, 2008)


Working on Large Shade Blind Trim
(December 18, 2008)


Cedar Ceiling - Color is same, buy daylight outside is making color difference in this photo
(December 18, 2008)


Adjusting Breakfast Nook Blinds
(December 18, 2008)


Garage Floor Color Being Applied on Polished Concrete
(December 18, 2008)


Garage Floor
(December 18, 2008)


Courtyard
(December 18, 2008)


Porte Couchere
(December 18, 2008)


Porte Couchere
(December 18, 2008)


Gate and Camera Control Conduits
(December 18, 2008)


Entry Touchpad
(December 18, 2008)


Counduits for Gate Controllers and Entry Touchpad
(December 18, 2008)


Concrete Entry w/Swale
(December 10, 2008)


Trench for Entry Gate Controls
(December 10, 2008)


Closeup of Recessed Motor and Support Column
(December 10, 2008)


Stepping Stones Near Fireplace
(December 10, 2008)


Modifying Stucco Details at Fireplace
(December 10, 2008)


Fireplace
(December 10, 2008)


Final Stucco Coat at Lanai
(December 10, 2008)


Lanai Ceiling
(December 10, 2008)


Painting Storage Closet Door
(December 10, 2008)


Statue from Pool Lanai
(December 10, 2008)


Statue from Pool Lanai
(December 10, 2008)


Statue from Lawn
(December 10, 2008)


Statue from Master Bed Lanai
(December 10, 2008)


Master Garden Shower Area
(December 10, 2008)


Pavers for Master Garden Bench
(December 10, 2008)


Stucco Prep at Master Shower Door
(December 10, 2008)


Last Section of Driveway
(December 3, 2008)


Last Section of Driveway
(December 3, 2008)


Last Section of Driveway
(December 3, 2008)


Palapa from Master Suite
(December 3, 2008)


Master Bed Ceiling
(December 3, 2008)


Revised TV Frame in Master Steam Shower
(December 3, 2008)


TV in Office, New Light Switch Next to Door
(December 3, 2008)


Gym Ceiling Blind Pocket Trim with Support Brackets
(December 3, 2008)


Gym Ceiling Blind
(December 3, 2008)


This Morning's Sunrise
(December 3, 2008)


Courtyard
(December 3, 2008)


Grass Pavers
(December 3, 2008)


Equipment Gates Almost Completed
(December 3, 2008)


Entry Statue
(November 26, 2008)


Archer
(November 26, 2008)


Driveway to Gate
(November 26, 2008)


Grade Beam for Gate Posts and Motors
(November 26, 2008)


Steel Column for Gate
(November 26, 2008)


Equipment Area Louvered Doors
(November 26, 2008)


Being Palapa Framing
(November 26, 2008)


Palapa from Pool Deck
(November 26, 2008)


Pouring Driveway
(November 20, 2008)


Driveway
(November 20, 2008)


From Hillside Above
(November 20, 2008)


Hillside
(November 20, 2008)


Painting Fascia
(November 20, 2008)


Hillside Below
(November 20, 2008)


Cottage
(November 20, 2008)


Cottage Bedroom Carpentry Complete
(November 20, 2008)


Cottage Bath Shower Tile Install
(November 20, 2008)


Chromatic Cove Lights in Living Room
(November 20, 2008)


Installing Appliance Panels
(November 20, 2008)


Warming Drawer Panel Supplied Not Wide Enough - Panel is approx 29" wide
(November 20, 2008)


Warming Drawer Panel Supplied Not Wide Enough - Drawings Show Panel 31 1/2" wide
(November 20, 2008)

Previous photos

as of October 30, 2008
as of September 30, 2008
as of August 28, 2008
as of July 31, 2008
as of June 30, 2008
as of May 23, 2008
as of April 28, 2008
as of March 6, 2008
as of February 26, 2008
as of January 25, 2008
as of December 15, 2007
as of November 28, 2007
as of October 30, 2007
as of September 28, 2007
as of August 30, 2007
as of July 23, 2007
as of June 29, 2007
as of May 24, 2007
as of April 23, 2007
as of March 29, 2007
as of February 27, 2007
as of December 26, 2006
as of November 30, 2006
as of October 31, 2006
as of September 29, 2006
as of September 12, 2006
as of June 1, 2006
as of April 26, 2006
Design Board Story Pole - September 12, 2005