Progress Through - 31 July, 2008



Courtyard Walkway
(July 31, 2008)


Courtyard Irrigation in Progress
(July 31, 2008)


Garage
(July 31, 2008)


Kitchen Desk Area Shelving Removed for Electrochromatic Glass Install
(July 31, 2008)


Kitchen
(July 31, 2008)


Rebuilding Soffit for New Window Shade Track
This track must be installed prior to Finish Plaster in this Area
(July 31, 2008)


Living Room
(July 31, 2008)


Spa Deck
(July 31, 2008)


Added Palapa Area Retaining Wall
(July 31, 2008)


Looking up from Palapa Deck - Added wall to right for Added Shower and Storm Runoff Control
(July 31, 2008)


Palapa Wall
(July 31, 2008)


Pool
Morning Superferry in Distance
(July 31, 2008)


Pool
(July 31, 2008)


Pool
(July 31, 2008)


We Need to Hook Up All Tiki Torches before we can hook up Propane throughout
(July 31, 2008)


Pool Deck
(July 31, 2008)


Kitchen
(July 25, 2008)


Kitchen
(July 25, 2008)


Kitchen
Need to Install Electrochromatic Panel before we can have Desk Area at Right Ready for Wall Plaster
(July 25, 2008)


Living Room Ceiling
(July 25, 2008)


Swimming Pool
(July 25, 2008)


Pool
(July 25, 2008)


Pool Deck with Protection Board
(July 25, 2008)


BBQ Area
(July 25, 2008)


View over Edge When Seated in Living Room
(July 25, 2008)


Pool
(July 25, 2008)


Living Room Changed Window Blind Pockets
Need Track Info and Time to Complete Work Before We Can Finish Plaster This Area
(July 25, 2008)


Old Window Blind Pockets to be Abandoned
This Entire Central Beam is to be Plastered to Door Track
(July 25, 2008)


Moving Scaffolding to Exterior Lanai For Outside Cedar Ceiling Install
(July 25, 2008)


Media Room Ready for Wall Plaster
(July 25, 2008)


Bed 2 Ready for Wall Plaster
(July 25, 2008)


Bed 2
(July 25, 2008)


View from Bed 2 Window
(July 25, 2008)


Bed 2 Closet Ready for Wall Plaster
(July 25, 2008)


Bath 2 Shower Ready for Wall Plaster (including prep over cement board - typical all showers)
(July 25, 2008)


Bed 2
(July 25, 2008)


Bed 3
(July 25, 2008)


Bed 3
(July 25, 2008)


Bed 4
(July 25, 2008)


Bed 4
(July 25, 2008)


View Out Bed 4 Window
(July 25, 2008)


Closet 4
(July 25, 2008)


Bath 4 - Small Strip between wall tile and Crown Molding to receive wall plaster
(July 25, 2008)


Bath 4
(July 25, 2008)


North Hallway Ceiling
(July 25, 2008)


North Hallway Ceiling
(July 25, 2008)


Gym
(July 25, 2008)


Gym
(July 25, 2008)


Large Window at North Hallway
(July 25, 2008)


Master Bed
(July 25, 2008)


Pool Deck from Master Bed
(July 25, 2008)


Master Bath Vanity High Window
(July 25, 2008)


From Cul-de-Sac
(July 22, 2008)


Swimming Pool
(July 22, 2008)


Swimming Pool
(July 22, 2008)


Swimming Pool
(July 22, 2008)


Spa
(July 22, 2008)


Spa Deck
(July 22, 2008)


Planter Above Spa Deck
(July 22, 2008)


Dining Area Doors
(July 22, 2008)


BBQ
(July 22, 2008)


Breakfast
(July 22, 2008)


Installing Hallway Window Blind Closure Trim below Crown
(July 22, 2008)


Basalt Rock for Benches and Pool Cap
(July 22, 2008)


30kW Generator
(July 22, 2008)


Stained Concrete Drive to Cottage
(July 22, 2008)


Stained Concrete Drive to Cottage
(July 22, 2008)


Entry Hall
(July 22, 2008)


Bed 3
(July 22, 2008)


Gym
(July 22, 2008)


Master Bed Garden
(July 22, 2008)


Rock Veneer in Garden
(July 22, 2008)


Wine Room Refrigeration Unit (next to Garage / Laundry Room)
(July 22, 2008)


Pool Pebbletech - Before Final Cleaning
(July 16, 2008)


Pool Pebbletech - Before Final Cleaning
(July 16, 2008)


All Soffit Repairs Complete in Kitchen except by Desk Area
(July 16, 2008)


Rock Veneer by Fireplace
(July 16, 2008)


Porte Couchere
(July 11, 2008)


Porte Couchere with Randy's Delivery
(July 11, 2008)


Generator - Still Need Gate Selection for All Mechanical Areas to Receive Gates
(July 11, 2008)


Propane Tank
(July 11, 2008)


Courtyard - Interior Plaster Material and Lanai Cedar on Breakfast Lanai
(July 11, 2008)


Driveway to Cottage ready for Pressure Wash Prep for Stain
(July 11, 2008)


Cottage Driveway
(July 11, 2008)


Relocated Stairs to Palapa / Cottage
(July 11, 2008)


Cottage Driveway Hillside
(July 11, 2008)


Stairs from Spa to Pool Deck
(July 11, 2008)


Stairs from Spa to Pool Deck
(July 11, 2008)


Need Tiki Torches to Finish Landscaping this Area and Several Others
(July 11, 2008)


Spa Deck Stairs
(July 11, 2008)


Excavation for Added Retaining Wall above Palapa
(July 11, 2008)


Added Stairs and Sidewalk to Palapa
(July 11, 2008)


Landscape Border Next To Spa Deck
(July 11, 2008)


Cottage From Palapa
(July 11, 2008)


Gym Lanai - Need Equipment Area Gate Here to Area at Right? Or is Adequately Screened from View as is?
(July 11, 2008)


Gym Ceilings Floated and Painted - Ready for Wall Plaster
(July 11, 2008)


Gym
(July 11, 2008)


North Hallway Ready for Wall Plaster
(July 11, 2008)


North Hallway Ready for Wall Plaster
(July 11, 2008)


Breakfast Lanai Crown Molding Prep
(July 11, 2008)


Paint Prep for South Hallway Ceiling
(July 11, 2008)


Wine Room A/C Installed in Ceiling (blurry, low light photo)
(July 11, 2008)


Cut Out for Added TV in Dining Area
(July 11, 2008)


Pool Deck Cleaned and Ready for Grout
(July 11, 2008)


Pool Deck
(July 11, 2008)


Pool Deck
(July 11, 2008)


Added Rock Veneer Wall Behind BBQ Area
(July 11, 2008)


Pool Deck View to Palapa and Cottage
(July 11, 2008)


Office Crown Molding Install
(July 11, 2008)


Office
(July 11, 2008)


Master Bedroom Ceiling Prep for Paint
(July 11, 2008)


Pool Tilework - Edge of Step Markers
(July 11, 2008)


Pool - Entry Step
(July 11, 2008)


Lane Marker on Floor
(July 11, 2008)


South Lane Marker Target on Wall, Water Line Tile and Deck Material cut down to Waterline Tile Size above
(July 11, 2008)


Lane Marker on Pool Floor
(July 11, 2008)


Wiring Pool Lights, Bench Edge Markers
(July 11, 2008)


North Edge to Receive Basalt Wall Cap - North Lane Marker Target to Left
(July 11, 2008)


Spa Seating Bench
(July 1, 2008)


Upper Planting Area
(July 1, 2008)


Planter Bench in Pool Deck
(July 1, 2008)


Master Bed Garden Irrigation in Progress
(July 1, 2008)


Master Bed Planting Area at End of Pool Deck
(July 1, 2008)


BBQ
(July 1, 2008)


Palapa
(July 1, 2008)


Palapa
(July 1, 2008)


Palapa
(July 1, 2008)


Added Stairs and Walkway to Palapa
Vertical Blue Pipe is Added Shower at Top of Stairs
Need to Relocate Tiki Torch - Too Close to Added Shower Area
(July 1, 2008)


Cottage
(July 1, 2008)


Lower Hillside
(July 1, 2008)


Lower Hillside
(July 1, 2008)


Cottage Driveway Side of Master Bath Garden Wall
(July 1, 2008)


Courtyard Wall - Driveway Side
(July 1, 2008)

Previous photos

as of June 30, 2008
as of May 23, 2008
as of April 28, 2008
as of March 6, 2008
as of February 26, 2008
as of January 25, 2008
as of December 15, 2007
as of November 28, 2007
as of October 30, 2007
as of September 28, 2007
as of August 30, 2007
as of July 23, 2007
as of June 29, 2007
as of May 24, 2007
as of April 23, 2007
as of March 29, 2007
as of February 27, 2007
as of December 26, 2006
as of November 30, 2006
as of October 31, 2006
as of September 29, 2006
as of September 12, 2006
as of June 1, 2006
as of April 26, 2006
Design Board Story Pole - September 12, 2005