Dixon Homes, Inc.
our home page
Residence
Progress Through - 30 June, 2008



Pool Equipment Vault
(June 30, 2008)


Spa Bench Install in Progress
(June 30, 2008)


Pool Deck
(June 30, 2008)


Pool Deck
(June 30, 2008)


Stairs and Path to Palapa
(June 30, 2008)


Garage
(June 30, 2008)


Hall to Office
(June 30, 2008)


Palapa Slab
(June 26, 2008)


Suggested Added Concrete Stairs to Lower Palapa - Added Spa Shower Area to Right
(June 26, 2008)


Stairs to Cottage
(June 26, 2008)


Added Tree Planter and Bench Seating Area in Pool Lanai (by BBQ)
(June 26, 2008)


Pool Deck
(June 26, 2008)


Pool Deck
(June 26, 2008)


Pool Deck
(June 26, 2008)


Hall to Garage
(June 26, 2008)


Hall to Kitchen
(June 26, 2008)


Hall to Office / Master Suite
(June 26, 2008)


Master Suite Entry to Office
(June 26, 2008)


Master Bath
(June 26, 2008)


Wine Room Ceiling
(June 26, 2008)


Kitchen Desk Area waiting for Added Electrochromatic Glass Installation
(June 26, 2008)


Hall at Entry
(June 26, 2008)


Close up Of Additional Hallway Crown Molding and Bottom Trim
(June 26, 2008)


Art Wall in Bed 2/3 Hallway
(June 26, 2008)


Gym Ceiling Skim Coat Prep and Primer
(June 26, 2008)


Gym - Close up of Typical Large Pocket Door Casing When we have Screens and Glass
(June 26, 2008)


Hall from Gym
(June 26, 2008)


Porte Couchere Planter Island with Concrete Curb
(June 24, 2008)


Porte Couchere
(June 24, 2008)


Porte Couchere
(June 24, 2008)


Propane Emergency Generator
(June 24, 2008)


Electrical Service Equipment and Meter Area
(June 24, 2008)


South Wing Air Conditioner Condensor Equipment Area
(June 24, 2008)


Propane Tank Area
(June 24, 2008)


Added Seating Bench Area Around Tree Planter in Lanai
(June 24, 2008)


Test Cleaning of an Area of the Exterior Stone
(June 24, 2008)


Stone Floor Trim at Curved Glass Doors
(June 24, 2008)


Pool Deck
(June 24, 2008)


Hall to Garage
(June 24, 2008)


Hall to Garage from Kitchen
(June 24, 2008)


Entry Door
(June 24, 2008)


Courtyard Wall Complete - Ready for Landscaping
(June 24, 2008)


Bedroom 4 - Moisture Protection on Concrete in Place under Carpet Areas
Ready for Wall Plaster
(June 24, 2008)


Closet 4 - Doors removed ready for Wall Plaster
(June 24, 2008)


Lower Hillside
(June 24, 2008)


Lower Hillside
(June 24, 2008)


Second Relocation of Bolders by Waterfall (5 in foreground)
Russel would like us to adjust a bit so they are not as linear, more natural looking
(June 19, 2008)


Preparing Bedroom 4 for Ceiling Paint
(June 19, 2008)


Preparing Bedroom 4 Closet Additonal Paneling for Finish
(June 19, 2008)


Bedroom 3 Walls Ready for Ventian Plaster
(June 19, 2008)


Bath 3 Walls Ready for Ventian Plaster
(June 19, 2008)


North Hallway (in Front of Media Room)
All Moldings Finished - Need to Float and Paint Ceiling
Then ready to Float and Plaster Walls
(June 19, 2008)


Bed 2 and Bath 2 Ready for Wall Plaster
All Trim for Hidden TV Panel by Randy and Kathy
(June 19, 2008)


Bed 2 and Bath 2 Ready for Wall Plaster
(June 19, 2008)


Closet 2 With Additional Paneling With Finish Coat
Only Need to Install Closet Rods, Plaster Walls and Install Ceiling Fixtures
and this is ready for Clothing Storage (same for Bed 3 Closet)
Not sure if these drawer will have pulls or not - can go either way as drawer is easy to grab
To right is touch latch access panel for Randy's wiring
(June 19, 2008)


Media Room Prep for Wood Trim Finish
(June 19, 2008)


Media Room
(June 19, 2008)


Typical temporary receptical installed (here in the baseboard) so we can have permanent power activated
(June 19, 2008)


Entry Door
(June 19, 2008)


Entry Door
(June 19, 2008)


Flooring Install on The Pool Deck
The deleted and added back in tree selected for this location is now not available?
Need an alternate selected and installed ASAP.
(June 19, 2008)


Pool Deck Floring
(June 19, 2008)


Pool Deck Flooring
(June 19, 2008)


Still Need to Complete Drywall Patch On Changed Soffit in Kitchen
Foreground won't be Complete until Chromatic Windows are Installed
(June 19, 2008)


Slightly Changed Drywall to The Left So Proportions Look Better after Cabinets were Installed
(June 19, 2008)


Several Lights Relocated in Kitchen Ceiling to Work Better with Added Soffit
(June 19, 2008)


Office Flooring Install Begun
(June 19, 2008)


Crown Molding Prep in Office / Garage Hallway
Here we have the added botom trim piece for uniformity with hallway window boxes
See north hallway photos above for finished product
(June 19, 2008)


Crown Molding Prep in Master Bath
Here the crown touches the wall without a bottom piece except above the window at the left
This is why it was critical to have decisions on windowcovering finalized prior to us starting the crowm
(June 19, 2008)


Crown Prep for her Vanity to left and curved window shade above tub to right
(June 19, 2008)


Left to Right Doors to Master Closet / Sauna (behind plywood) / WC
(June 19, 2008)


Added Gateway to Master Garden
Will we have a gate here or leave it open?
Shower is pretty private now with added wall
(June 19, 2008)


Missing Rock Veneer is for Outdoor Shower Area
(June 19, 2008)


Palapa Slab Prep and Lowered to 18" below top of Lower Wall Veneer
Here we are reworking existing electrical prep rough-in that was figured for higher slab elevation
as well as perform rough-in to column areas together with steel reinforcement work
(June 19, 2008)


Lowering Slab Has Created a Steeper Slope at Added Shower Area
Strongly Suggest Adding another Retaining Wall Here
(June 19, 2008)


Lowering Palapa Slab Has Created a Steeper Slope Here
Strongly Suggest Adding another Retaining Wall Here
Will Ease Transition and Redirect Storm Water Away from this Area
(June 19, 2008)


Need to Add Stairway for transition from Lowered Palapa to Spa Deck
Added shower area to right would benefit from added retaining wall
(June 19, 2008)


Added Retaining Wall would Direct Storm Water in Direction of these Trees instead of to Palapa Deck
(June 19, 2008)


Pool Waterline Tile Install
(June 19, 2008)


Dining Area
(June 19, 2008)


BBQ Area (Fiberglass Door Needs Paint)
(June 19, 2008)


Driveway Runners to Cottage
(June 19, 2008)


Driveway to Cottage
(June 19, 2008)


Backup Generator Area Stucco Complete
Need Gate Manufacturer and Style and Color and/or Subcontractor Specified before we can order
Jayco Hawaii who typically did this for us in the past is currently not working on Maui
(June 19, 2008)


Electrical Service
When we receive permanant power center temporary panel will be gone
(June 19, 2008)


Courtyard Breakfast Lanai
(June 19, 2008)


Garage
(June 19, 2008)


Completing Rock Veneer on Driveway Side of Courtyard Wall
(June 19, 2008)


Porte Couchere Concrete Prep
(June 19, 2008)


Entry From Porte Couchere
(June 19, 2008)


Gym Lanai and Equipment Area Behind Bath 4
(June 19, 2008)


Entry Drive
(June 19, 2008)


Cottage Driveway
(June 11, 2008)


Cottage Driveway
(June 11, 2008)


Cottage Driveway
(June 11, 2008)


Cottage Driveway
(June 11, 2008)


Cottage
(June 11, 2008)


Master Bedroom Garden Wall Veneer Almost Complete
(June 11, 2008)


Bottom Section of Cottage Driveway
(June 9, 2008)


Cottage Driveway
(June 9, 2008)


Cottage Driveway
(June 9, 2008)


Equipment Pads
(June 9, 2008)


Gym
(June 9, 2008)


Gym
(June 9, 2008)


Pool Waterline Tile
(June 9, 2008)


Fireplace Lanai
(June 4, 2008)


Stairway to Cottage Layout for Review
(June 4, 2008)


Hillside Below Palapa
(June 4, 2008)


Cottage Driveway Prep
(June 4, 2008)


Cottage Driveway Prep
(June 4, 2008)


Anti-Fracture Membrane at Pool Lanai
(June 2, 2008)


Exterior Stone by Fireplace - culling out light tiles
(June 2, 2008)


Exterior Stone
(June 2, 2008)


Exterior Stone
(June 2, 2008)


Master Closet Punchlist Complete?
(June 2, 2008)


Master Closet Punchlist Complete?
(June 2, 2008)


Master Closet Punchlist Complete? (Why do lower shelves not line up?)
(June 2, 2008)


Master Bed Window
(June 2, 2008)


Master Bed Window
(June 2, 2008)


Master Shower
(June 2, 2008)


Master Steam Room
(June 2, 2008)


Master Garden Wall - Inside
(June 2, 2008)


Master Garden Wall - Driveway Side
(June 2, 2008)


Driveway Prep to Cottage
(June 2, 2008)


Palapa Hillside Topsoil
(June 2, 2008)


Palapa Hillside
(June 2, 2008)


Cottage Driveway Turnaaround Prep
(June 2, 2008)


Cottage Driveway
(June 2, 2008)


Cottage Driveway
(June 2, 2008)


Courtyard Rock Veneer
(June 2, 2008)


Starting Stainless Steel Soffit Vent
(June 2, 2008)


Courtyard
(June 2, 2008)


Hallway Ceiling
(June 2, 2008)


View from Lot Above
(June 2, 2008)


Rock Veneer Wainscoat Corner at Garage
(June 2, 2008)

Previous photos

as of May 23, 2008
as of April 28, 2008
as of March 6, 2008
as of February 26, 2008
as of January 25, 2008
as of December 15, 2007
as of November 28, 2007
as of October 30, 2007
as of September 28, 2007
as of August 30, 2007
as of July 23, 2007
as of June 29, 2007
as of May 24, 2007
as of April 23, 2007
as of March 29, 2007
as of February 27, 2007
as of December 26, 2006
as of November 30, 2006
as of October 31, 2006
as of September 29, 2006
as of September 12, 2006
as of June 1, 2006
as of April 26, 2006
Design Board Story Pole - September 12, 2005