Residence
Progress Through - 23 May, 2008



View from Neighbor's Lot Above
(May 23, 2008)


View from Neighbor's Lot Above - looking North
(May 23, 2008)


View from Neighbor's Lot Above - Enclosed Garden Area
(May 23, 2008)


View from Top of the Street
(May 23, 2008)


Bedroom 3 Ready for Final Finish Coat on Sapele Moldings
(May 23, 2008)


Gym looking onto Courtyard
(May 23, 2008)


Gym Looking out to Street
(May 23, 2008)


Exterior Gym Lanai (North side by street)
(May 23, 2008)


Detail of Slot Drain in front of Glass Door on Gym Lanai
Joints not grouted yet, hole in background is for copper downspout
(May 23, 2008)


Gym Utility Room - Solar Water Heaters in This Room
(May 23, 2008)


Looking up Street from Gym Lanai
(May 23, 2008)


Added Pool Equipment Lower North Retaining Wall and Rock Veneer
(May 23, 2008)


Added Pool Equipment Lower South Retaining Wall and Rock Veneer (in foreground)
(May 23, 2008)


Pool Tile Installed at Spillway (Upper Tan Piece is Temporary Formwork)
(May 23, 2008)


Lower Lawn Ready for First Mowing
(May 23, 2008)


Cottage
(May 23, 2008)


Plumeria Trees in Bloom at Lower Lawn
(May 23, 2008)


Topsoil Placed below Cottage
(May 23, 2008)


Looking up to Driveway to Cottage
(May 23, 2008)


Topsoil Around Cottage
(May 23, 2008)


Topsoil Around Cottage
(May 23, 2008)


Cottage Lanai
(May 23, 2008)


Hillside Below Palapa
(May 23, 2008)


Cottage Driveway
(May 23, 2008)


End of Cottage Driveway
(May 23, 2008)


Courtyard Rock Veneer
(May 23, 2008)


Gym Doors at Courtyard
(May 23, 2008)


Fireplace Area - Blue Material is Exterior Tile Slipsheet Membrane
(May 23, 2008)


Exterior Stone at Curved Doors
(May 23, 2008)


Plants Outside Media Room
(May 23, 2008)


All Millwork Sanded, Sealed with Finish and Ready for Install - Staging in Living Room
(May 23, 2008)


Coutryard Wall
(May 23, 2008)


Coutryard Wall
(May 23, 2008)


Entry
(May 19, 2008)


Upper Hillside
(May 19, 2008)


Upper Lawn Area behind Gym and Bed 4
(May 19, 2008)


Typical Concrete Border for Maintenance Strip
(May 19, 2008)


Planter over Pool Equipment Room
(May 19, 2008)


Added Landscape Walls to Both Sides of Pool Vault
(May 19, 2008)


Pool Spillway Work Started
(May 19, 2008)


Pool
(May 19, 2008)


Cottage Stucco Brown Coat in Progess
(May 19, 2008)


A/C Equipment Area Wall behind Bath 4
(May 9, 2008)


Large Glass Windows Installed at Courtyard
(May 9, 2008)


Inside View of Large Glass at Hallway
(May 9, 2008)


Courtyard Rock Veneer in Progress
(May 9, 2008)


Rock Column at Entry next to Porte Couchere
(May 9, 2008)


Wine Room
(May 9, 2008)


Sauna
(May 9, 2008)


Glass Installed at Hallway From Master Suite
(May 9, 2008)


Hallway Glass Outside
(May 9, 2008)


Powder by Wine Room
(May 9, 2008)


Covered Lanai Fireplace Area
(May 9, 2008)


Courtyard
(May 9, 2008)


Courtyard
(May 9, 2008)


Courtyard
(May 9, 2008)


Solar Panels
(May 9, 2008)


Grouting Courtyard Wall
(May 9, 2008)


Courtyard Wall
(May 9, 2008)


Grouting Courtyard Wall
(May 9, 2008)


Grouting Courtyard Wall
(May 9, 2008)


Landscaping - All 6 Large Palms in Place
(May 9, 2008)


Lower Hillside and Offsite Parking for Concrete Pour
(May 9, 2008)


Landscaping by Bed 2,3 and 4
(May 9, 2008)


Morning Superferry in the Distance
(May 9, 2008)


Landscape
(May 9, 2008)


Rock Veneer at Porte Couchere
(May 7, 2008)


Rock Veneer
(May 7, 2008)


Crown Molding in Hallway
(May 7, 2008)


Pocket Door in Bath 3
(May 7, 2008)


Water Closet Area in Bath 3 with Stone Shelf
(May 7, 2008)


Building Wine Racks, Redwood Installed on Walls and Ceiling in Wine Room
(May 7, 2008)


Wine Racks
(May 7, 2008)


Final Grading Next To BBQ Deck Area
(May 7, 2008)


Cut Out For Tree in Deck
(May 7, 2008)


3 of 6 Foxtail Palms Placed in this Cluster
(May 7, 2008)


Same Foxtails Palms from Bedroom 2
(May 7, 2008)


Fireplace Doors
(May 7, 2008)


Fireplace Doors
(May 5, 2008)


Fireplace Doors
(May 5, 2008)


Tree Cut Out in BBQ Deck
(May 5, 2008)


Lunchtime for the Rock Veneer Crew in Porte Couchere
(May 2, 2008)


Courtyard Wall
(May 2, 2008)


Solar Electric Panels Installation
(May 2, 2008)


Footings for Added Lower Walls by Pool Equipment Room
(May 2, 2008)


3 Palms
(May 2, 2008)


3 Palms by Media Room
(May 2, 2008)


Lower Hillside Grassing
(May 2, 2008)


Streetside Landscaping
(May 2, 2008)


You Can Not See Street or Cul-De-Sac from Cottage
(May 2, 2008)


Bedroom 4 Closet with Added Cherry Paneling and Door for Randy's Wires
(May 2, 2008)


All Moldings Installed in Bedroom 3
(May 2, 2008)


Bedroom 3 Door to Hallway and Closet
(May 2, 2008)


Bedroom 3 Closet (Low Light Photo) With Lowered Shelf and Cherry Paneling
(May 2, 2008)


Bath 3
(May 2, 2008)


Bath 4
(May 2, 2008)


Sauna
(May 2, 2008)


Sauna
(May 2, 2008)


Master Tub Deck
(May 2, 2008)


Master Steam Shower Room
(May 2, 2008)


Master Steam Shower Room
(May 2, 2008)


Master Steam Shower Soaker in Ceiling
(May 2, 2008)


Master Bedroom Garden
(May 2, 2008)


Master Bedroom Garden Gate
(May 2, 2008)


Cottage Kitchenette
(May 2, 2008)


Cottage Bath
(May 2, 2008)

Previous photos

as of April 28, 2008
as of March 6, 2008
as of February 26, 2008
as of January 25, 2008
as of December 15, 2007
as of November 28, 2007
as of October 30, 2007
as of September 28, 2007
as of August 30, 2007
as of July 23, 2007
as of June 29, 2007
as of May 24, 2007
as of April 23, 2007
as of March 29, 2007
as of February 27, 2007
as of December 26, 2006
as of November 30, 2006
as of October 31, 2006
as of September 29, 2006
as of September 12, 2006
as of June 1, 2006
as of April 26, 2006
Design Board Story Pole - September 12, 2005