Residence
Progress Through - 28 April, 2008
Lower Hillside
(April 28, 2008)
Lower Hillside
(April 28, 2008)
Lower Hillside
(April 28, 2008)
Moldings Installed in Bedroom 3
(April 28, 2008)
Window Casing Closeup
(April 28, 2008)
Added Back and Side Paneling to Guest Closets, Lowered Upper Shelf
(Still need to apply finish to paneling)
(April 28, 2008)
Confirming Lanai Tree Location with Russel
(April 28, 2008)
Cottage
(April 28, 2008)
Tree Trimming has made Neighbor more visable
(April 28, 2008)
Tree Trimming has made Neighbor more visable
(April 28, 2008)
Begin Landscaping next to North Side of House
(April 22, 2008)
Northside Landscaping
(April 22, 2008)
Grassing on Lower Hillside
(April 22, 2008)
Grassing on Lower Hillside
(April 22, 2008)
Waterproof and Drain Gravel over Pool Equipment Vault
(April 22, 2008)
Fill Material Placed Next to House
(April 22, 2008)
Clear Glass Now in Cabinet Doors
(April 22, 2008)
Soffit Added Over Cabinets in Kicthen
(April 22, 2008)
Soffit Added Over Cabinets in Kicthen
(April 22, 2008)
Preparing Moldings
(April 22, 2008)
Bath 2 Shower Fixture Installed
(April 22, 2008)
Crown Molding in Bedroom 3
(April 22, 2008)
Bath 4 Shower Controls
(April 22, 2008)
Door Prep
(April 22, 2008)
Master Shower Glass Block
(April 22, 2008)
Master Garden Wall
(April 22, 2008)
Placing Fill by Master Garden Wall
(April 22, 2008)
Master Garden Wall
(April 22, 2008)
Master Garden Wall
(April 22, 2008)
Master Bath Garden Gate
(April 22, 2008)
Master Steam Shower
(April 22, 2008)
Master Bedroom
(April 22, 2008)
Porte Couchere Rock Veneer
(April 22, 2008)
Cottage Lath in Progress
(April 22, 2008)
Rock Veneer Beginning at Porte Couchere
(April 5, 2008)
Rock Veneer at Guest Bedrooms
(April 5, 2008)
Rock Veneer at Guest Bedrooms
(April 5, 2008)
Hiding Copper Downspout Support Bracket in Rock Veneer
(April 5, 2008)
Mockup of Almost Hidden Copper Downspouts at Garage
(April 5, 2008)
Tree by Guestroom
(April 5, 2008)
Subdrainage Prep above Pool Equipment Vault
(April 5, 2008)
Gutters Installed at Roof Edge above Pool - All Gutters Installed
(April 5, 2008)
Curved Glass Doors at Living Room
(April 5, 2008)
Garage
(April 5, 2008)
Breakfast Lanai
(April 5, 2008)
Kitchen Windows
(April 5, 2008)
View from Lot Above - Solar Water Panels Installed over Gym
(April 5, 2008)
From Lot Above
(April 5, 2008)
Bedroom Garden Wall Foundation Prep
(April 5, 2008)
Crown Molding in Progress in Entertainment Room
Leaded Glass Panels removed from Cabinet Doors
(April 5, 2008)
Entertainment Room
(April 5, 2008)
Casing Sanded, Stained and Sealed Ready for Install
(April 5, 2008)
Baseboard
(April 5, 2008)
All Swinging Doors at House Installed, Tested and Ready for Paint
(April 5, 2008)
Inside Cedar Ceiling at Living Room Carpentry Almost Complete
(April 5, 2008)
Closeup of 2x4 Clear Cedar Ceiling Material
(April 5, 2008)
Leaded Glass Panels Removed in Kitchen - Still Need to Build Added Soffits over Cabinets
(April 5, 2008)
Added Stone Window Sill and Accent Strip in Kitchen
(April 5, 2008)
Kitchen
(April 5, 2008)
Master Shower Glass Block Wall from Bedroom
(April 5, 2008)
Shower Wall and Bench
(April 5, 2008)
Shower Wall
(April 5, 2008)
Shower Bench Edge Detail - Glass Tile Cap Not Yet Installed
(April 5, 2008)
Master Steam Shower
(April 5, 2008)
Master Steam Shower Bench (not grouted yet)
(April 5, 2008)
Master Bedroom Closet before Shelving Adjustments
(April 5, 2008)
Master Bedroom Closet before Shelving Adjustments
(April 5, 2008)
Previous photos
as of March 6, 2008
as of February 26, 2008
as of January 25, 2008
as of December 15, 2007
as of November 28, 2007
as of October 30, 2007
as of September 28, 2007
as of August 30, 2007
as of July 23, 2007
as of June 29, 2007
as of May 24, 2007
as of April 23, 2007
as of March 29, 2007
as of February 27, 2007
as of December 26, 2006
as of November 30, 2006
as of October 31, 2006
as of September 29, 2006
as of September 12, 2006
as of June 1, 2006
as of April 26, 2006
Design Board Story Pole - September 12, 2005