Dixon Homes, Inc.
our home page
Residence
Progress Through - 6 March, 2008
Top of Street
(March 6, 2008)
Upper Hillside
(March 6, 2008)
Lower Hillside
(March 6, 2008)
Lower Hillside
(March 6, 2008)
Guest Bedrooms
(March 6, 2008)
Stainless Access Panel for Tub Motor
(March 6, 2008)
Fireplace
(March 6, 2008)
Master Closet
(March 6, 2008)
Door to Sauna
(March 6, 2008)
Sauna Benchwork
(March 6, 2008)
Master Steam Shower Tile in Progress
(March 6, 2008)
Master Steam Shower
(March 6, 2008)
Master Bath Stucco Prep
(March 6, 2008)
Curved Window at Master Bath
(March 6, 2008)
Added Window Blind Channel above Curved Windows
(March 6, 2008)
Channel also added to Master Suite
(March 6, 2008)
House Sapele Doors have Arrived
(March 6, 2008)
More House Doors
(March 6, 2008)
Glass Block Shower Screen in Bath 2
(March 6, 2008)
Bath 2 Tub Deck
(March 6, 2008)
Bath 2 Shower
(March 6, 2008)
Gym Cabinets
(March 6, 2008)
Utility Room 2 (by Gym) Cabinets
(March 6, 2008)
Bath 4 Shower
(March 6, 2008)
Bath 4 Shower
(March 6, 2008)
Bath 3 Tub Deck
(March 6, 2008)
Bath 3 Tub Deck
(March 6, 2008)
Powder Room 2 (by Entertainment Room)
(March 6, 2008)
BBQ
(March 6, 2008)
BBQ
(March 6, 2008)
Stucco Prep by Dining Room Door
(March 6, 2008)
Added Trench Drain next to Driveway to Cottage
(March 6, 2008)
Looking up from Cottage Driveway
(March 6, 2008)
Cottage Flooring
(March 6, 2008)
Installing Cottage Windows
(March 6, 2008)
Master Bath Curved Window
(March 3, 2008)
Standing on top of Waterfall
(March 3, 2008)
Previous photos
as of February 26, 2008
as of January 25, 2008
as of December 15, 2007
as of November 28, 2007
as of October 30, 2007
as of September 28, 2007
as of August 30, 2007
as of July 23, 2007
as of June 29, 2007
as of May 24, 2007
as of April 23, 2007
as of March 29, 2007
as of February 27, 2007
as of December 26, 2006
as of November 30, 2006
as of October 31, 2006
as of September 29, 2006
as of September 12, 2006
as of June 1, 2006
as of April 26, 2006
Design Board Story Pole - September 12, 2005