Residence
Progress Through - 26 February, 2008
Stucco Sealer - Bed 4 to the Left, Bed 3 to the Right
(February 26, 2008)
Stucco Sealer
(February 26, 2008)
Porte Couchere Stucco Ceiling Complete
(February 26, 2008)
Courtyard Hallway
(February 26, 2008)
Living Room Ceiling
(February 26, 2008)
Master Steam Room Tile
(February 26, 2008)
Bed 2 Closet
(February 26, 2008)
Bed 2 Closet (Blurry Photo)
I am 5'-9" tall and I can not touch top closet rod
(February 26, 2008)
Bed 4 Closet
(February 26, 2008)
Kitchen Counters
(February 25, 2008)
Kitchen Curved Island Counter
(February 25, 2008)
Bath 2 Tub Deck
(February 25, 2008)
Bath 2 Tub Deck
(February 25, 2008)
Bath 2 Vanity
(February 25, 2008)
Bath 2 Vanity
(February 25, 2008)
Entertainment Room
(February 25, 2008)
Entertainment Room
(February 25, 2008)
Installing Upper Curved Glass in Living Room
(February 25, 2008)
Living Room High Glass
(February 25, 2008)
Living Room
(February 25, 2008)
Living Room
(February 25, 2008)
Finished Stucco by Bed 4
(Lower portion will get rock veneer)
(February 20, 2008)
Spreading Finish Stucco
(February 20, 2008)
Testing Waterfeature Pumps
(February 20, 2008)
Waterfeature
(February 20, 2008)
Pump Room Vault
(February 20, 2008)
Courtyard
(February 20, 2008)
Breakfast Lanai
(February 20, 2008)
Bath 2 Shower - Floor with Larger Tiles and Grouted
(Glass block divider not yet installed)
(February 20, 2008)
Bath 3 Shower
(February 20, 2008)
Bath 4 Shower
(February 20, 2008)
Gym Cabinets and TV Support Bracket
(February 20, 2008)
Sauna
(February 20, 2008)
Sauna
(February 20, 2008)
Master Closet
(February 20, 2008)
Pantry (low light fuzzy photo)
(February 20, 2008)
Upper Hillside
(February 20, 2008)
Lower Hillside
(February 20, 2008)
Large Tree by Bed 2/3
(February 20, 2008)
Green Line is Extention of Courtyard Wall
(February 20, 2008)
Green Line is Foundation of Master Suite Garden Wall
(February 20, 2008)
Garden Area behind Garage
(February 20, 2008)
Redesigned Exhaust Hood - Soffit lights relocated - old holes not yet patched
(February 20, 2008)
Gym Equipment Area
(February 11, 2008)
Lower Hillside
(February 11, 2008)
Property Line Planting
(February 11, 2008)
Property Line Planting
(February 11, 2008)
Street Side Planting
(February 11, 2008)
Palapa
(February 11, 2008)
Waterfeature
(February 11, 2008)
Waterfeature
(February 11, 2008)
Waterfeature
(February 11, 2008)
Waterfeature
(February 11, 2008)
Dry Stream Bed
(February 11, 2008)
Waterfeature
(February 11, 2008)
Back of Waterfeature
(February 11, 2008)
Copper Chimney Cap
(February 11, 2008)
Courtyard
(February 11, 2008)
Courtyard
(February 11, 2008)
Lowered Upper Tape by 30cm
(February 11, 2008)
Stucco Prep
(February 11, 2008)
Kitchen
(February 11, 2008)
Kitchen Countertops Started
(February 5, 2008)
Kitchen Islands - Cooktop Area
(February 5, 2008)
Cooktop
(February 5, 2008)
Prep Sink Area
(February 5, 2008)
Curved Bar Seating Area with Steel Support Brackets and Plate
(February 5, 2008)
Office
(February 5, 2008)
Office
(February 5, 2008)
Revised Bath 2 Floor Tile
(February 5, 2008)
Previous photos
as of January 25, 2008
as of December 15, 2007
as of November 28, 2007
as of October 30, 2007
as of September 28, 2007
as of August 30, 2007
as of July 23, 2007
as of June 29, 2007
as of May 24, 2007
as of April 23, 2007
as of March 29, 2007
as of February 27, 2007
as of December 26, 2006
as of November 30, 2006
as of October 31, 2006
as of September 29, 2006
as of September 12, 2006
as of June 1, 2006
as of April 26, 2006
Design Board Story Pole - September 12, 2005