Progress Through - 30 October, 2007
Rock Work in Courtyard
(October 30, 2007)
Waterfall at Courtyard
(October 30, 2007)
Begin Stucco Lath
(October 30, 2007)
Stucco Lath
(October 30, 2007)
Courtyard
(October 12, 2007)
Breakfast Lanai
(October 12, 2007)
Begin Setting Rocks
(October 12, 2007)
Palapa Area Below, Master Bed Garden above
(October 12, 2007)
Future Statue Area in above Palapa
(October 12, 2007)
Pool Deck from Master
(October 12, 2007)
Upper Hillside
(October 12, 2007)
Cottage
(October 9, 2007)
Recess for TV to left (photo a little dark)
(October 9, 2007)
Cottage Cabinet Area
(October 9, 2007)
Cottage Bedroom looking to Bath and Living Room
(October 9, 2007)
Cottage is Screened from the Street by Hillside below House
(October 9, 2007)
Garage
(October 9, 2007)
Kitchen
(October 9, 2007)
BBQ Area
(October 9, 2007)
Glass Doors at Gym Looking out to Courtyard
(October 9, 2007)
Stairs at Waterfeature up to Porte Couchere
(October 9, 2007)
Waterfeature
(October 9, 2007)
Some Solar Roof Brackets Installed
(October 9, 2007)
Spa Deck Area
(October 9, 2007)
Deck Near Palapa
(October 9, 2007)
Recent Rains in the Past Two Weeks
(October 9, 2007)
Dining Room Glass Doors from Inside
(October 5, 2007)
Breakfast Doors from Inside (With Blue Protective Film Installed)
(October 5, 2007)
Kitchen Stone Flooring
(October 5, 2007)
Living Room Stone Flooring
(October 5, 2007)
Preparing Sidewalk
(October 5, 2007)
Lanai at Breakfast Area Poured
(October 5, 2007)
Relocated Stairs at Hallway to Master Suite
(October 5, 2007)
Stairs and Sidewalk Prep by Gym
(October 5, 2007)
Previous photos
as of September 28, 2007
as of August 30, 2007
as of July 23, 2007
as of June 29, 2007
as of May 24, 2007
as of April 23, 2007
as of March 29, 2007
as of February 27, 2007
as of December 26, 2006
as of November 30, 2006
as of October 31, 2006
as of September 29, 2006
as of September 12, 2006
as of June 1, 2006
as of April 26, 2006
Design Board Story Pole - September 12, 2005