Residence
Progress Through - 24 May, 2007
Roofing at Garage
(May 24, 2007)
Roofing
(May 24, 2007)
Roofing
(May 24, 2007)
Roofing
(May 24, 2007)
Stairway to Spa Shaping, Cottage Framing Beyond
(May 24, 2007)
Cottage Framing
(May 24, 2007)
Palapa Wall Grouted
(May 24, 2007)
Pool Equipment Vault
(May 24, 2007)
Pool Equipment Vault
(May 24, 2007)
Living Room Soffit
(May 24, 2007)
Living Room Soffit
(May 24, 2007)
Prep for Stairway
(May 24, 2007)
Prep for Stairway
(May 24, 2007)
Lansdcape Area Between Stair and Pool
(May 24, 2007)
Cottage Framing
(May 24, 2007)
From Lot Above
(May 18, 2007)
From Lot Above
(May 18, 2007)
Master Suite
(May 18, 2007)
Lower Spa Deck Area
(May 18, 2007)
Lower Spa Deck Area
(May 18, 2007)
Future Stair Area
(May 18, 2007)
Weep Fabric installed over Waterproofing at South Stair
(May 18, 2007)
Waterproofing behind North Stair Wall
(May 18, 2007)
Pool Equipment Room - CMU walls beginning
(May 18, 2007)
Most of the Spa Lines are Backfilled with Sand
(May 18, 2007)
Gym
(May 18, 2007)
Gym
(May 18, 2007)
Gym
(May 18, 2007)
Courtyard
(May 18, 2007)
Guest Bath
(May 18, 2007)
Guest Bath
(May 18, 2007)
Cottage
(May 18, 2007)
Master Vanity
(May 18, 2007)
Bath Steam Bath
(May 18, 2007)
Breakfast Bay
(May 18, 2007)
Dining / Living Ceiling
(May 18, 2007)
Gym Lanai Slab and A/C Equipment Pad Poured
(May 15, 2007)
Gym Lanai Slab and A/C Equipment Pad Poured
(May 15, 2007)
Cottage Slab Poured
(May 14, 2007)
Corner Footing at Cottage
(May 14, 2007)
Cottage Slab from Above
(May 14, 2007)
Roof Tile at Garage
(May 14, 2007)
Lathing and Copper Valley Flashing prep for Roof Tile
(May 14, 2007)
Placing Concrete for A/C Equipment Area next to Gym Lanai
(May 14, 2007)
Roof Prep over Breakfast Bay
(May 14, 2007)
Roof Prep over Master Bed
(May 14, 2007)
Roof Tile
(May 9, 2007)
Partial Electrical Wiring for Questron System - Master Suite
(May 9, 2007)
Prep for Concrete Lanai at Pool Deck
(May 9, 2007)
Steam Room Equipment in Ceiling Area above Master Bath
(May 9, 2007)
Guest Bedrooms
(May 9, 2007)
Porte Couchere
(May 7, 2007)
Garage
(May 7, 2007)
Courtyard Side of Porte Couchere
(May 7, 2007)
Courtyard Side of Porte Couchere
(May 7, 2007)
Small Landscape Bench Wall
(May 7, 2007)
South Stair Wall to Spa Deck
(May 7, 2007)
North Stair Wall to Spa Deck
(May 7, 2007)
Dining Area with Merlin's Staff
(May 7, 2007)
Great Room Ceiling
(May 7, 2007)
Hall to Master Bedroom Suite from Kitchen
(May 7, 2007)
Living Room
(May 7, 2007)
Palapa Wall in Foreground
(May 7, 2007)
Cottage Slab Below
(May 7, 2007)
Spa Deck looking up to House
(May 7, 2007)
Cottage Reinforcement
(May 7, 2007)
Cottage Reinforcement
(May 7, 2007)
Cottage
(May 7, 2007)
Cottage
(May 7, 2007)
Upper Hillside
(May 7, 2007)
View from Neighbor's Lot Above
(May 7, 2007)
View from Neighbor's Lot Above
(May 7, 2007)
Upper Hillside
(May 7, 2007)
Previous photos
as of April 23, 2007
as of March 29, 2007
as of February 27, 2007
as of December 26, 2006
as of November 30, 2006
as of October 31, 2006
as of September 29, 2006
as of September 12, 2006
as of June 1, 2006
as of April 26, 2006
Design Board Story Pole - September 12, 2005