Progress Through - March 29, 2007



Upper Hillside Trees Planting in Progress
(March 29, 2007)


Gym from Upper Hillside
(March 29, 2007)


View of House from Future Gate
(March 29, 2007)


Porte Couchere
(March 29, 2007)


Looking up From Porte Couchere
(March 29, 2007)


Irrigation Complete, Trees Planted, Topsoil Being Placed on Upper Hillside
(March 29, 2007)


Roof Framing at Center Section of House in Progress
(March 29, 2007)


Primed Fascia Ready for Install
(March 29, 2007)


Master Shower
(March 29, 2007)


Master Steam Room
(March 29, 2007)


Master Vanity
(March 29, 2007)


Master Bed Windows - Grading is Substantially Complete, Dust Fence Removed
(March 29, 2007)


Ducting above Master Bath
(March 29, 2007)


Air Handler near Office
(March 29, 2007)


Upper Low Landscape Wall Footing
(March 29, 2007)


Same Wall From Another Angle
(March 29, 2007)


Curved Stair Wall next to Pool
(March 29, 2007)


Other Curved Stair Wall
(March 29, 2007)


View From Pool Deck
(March 29, 2007)


Preparing to Concrete Floor of Pool Equipment Room
(March 29, 2007)


Driveway to Cottage
(March 29, 2007)


Cottage Retaining Walls
(March 29, 2007)


Forming Cottage Slab
(March 29, 2007)


Trenching for Cottage Plumbing
(March 29, 2007)


Palapa Footing
(March 29, 2007)


Looking up to Future Stairs from Spa up to Pool Deck
(March 29, 2007)


Porte Couchere Framing
(March 19, 2007)


Gym and Bed 4 Roof
(March 19, 2007)


Gym Roof
(March 19, 2007)


Porte Couchere
(March 19, 2007)


Lower Cottage Retaining Wall
(March 19, 2007)


Upper Cottage Retaining Wall
(March 19, 2007)



(March 19, 2007)


Upper Hillside Irrigation
(March 9, 2007)


Upper Hillside Irrigation
(March 9, 2007)


Porte Couchere from Above
(March 9, 2007)


Courtyard
(March 9, 2007)


Master Suite
(March 9, 2007)


Courtyard
(March 9, 2007)


Master Suite
(March 9, 2007)


Foundation for Low Wall Dutside Dining / Hall to Master
(March 9, 2007)


Curved Stair Wall Foundations
(March 9, 2007)


Palapa Wall Foundation Prep
(March 9, 2007)


Upper Cottage Wall Grouted, Lower Cottage Wall under Construction
(March 9, 2007)


Master Bed Ceiling
(March 9, 2007)


Looking at Courtyard from Breakfast Area
(March 9, 2007)


Media Room
(March 9, 2007)


Pool Deck
(March 9, 2007)


Bedroom 2
(March 9, 2007)


Pool Area
(March 9, 2007)


Living Room
(March 9, 2007)


Hall from Gym to Bed 2/3
(March 9, 2007)


Bed 3
(March 9, 2007)


Garage
(March 9, 2007)


Porte Couchere from Garage
(March 9, 2007)


Porte Couchere Roof Framing
(March 8, 2007)


Porte Couchere Roof Framing
(March 8, 2007)


Bed 4 Roof
(March 8, 2007)


Porte Couchere and Gym Lanai Roof
(March 8, 2007)


Gym
(March 8, 2007)


Gym / Bed 4 / Bed 3 Roof from Street
(March 6, 2007)


Porte Couchere
(March 6, 2007)


Pouring Curved Stair Wall Foundation
(from pool deck to spa deck)
(March 6, 2007)


Same Footing
(March 6, 2007)


Other Curved Wall Footing
(March 6, 2007)


Curved Wall Below Cottage
(March 6, 2007)


Curved Wall Below Cottage
(March 6, 2007)

Previous photos

as of February 27, 2007
as of December 26, 2006
as of November 30, 2006
as of October 31, 2006
as of September 29, 2006
as of September 12, 2006
as of June 1, 2006
as of April 26, 2006
Design Board Story Pole - September 12, 2005