Dixon Homes, Inc.
our home page
Residence
Progress Through - 31 October, 2006
End of the Day - South Portion of House from Lot Above
(October 31, 2006)
North Portion of House from Lot Above
(October 31, 2006)
Garage and Master Suite from Lot Above
(October 31, 2006)
Early in the Day - Gym / Guest Bed Area before Concrete is Placed
(October 31, 2006)
Daughter's Bedrooms
(October 31, 2006)
Finishing Garage Floor
(October 31, 2006)
Master Suite
(October 31, 2006)
Pumping Concrete to Guest Bed
(October 31, 2006)
Garage
(October 31, 2006)
Gym and Mechanical Room
(October 31, 2006)
Master Bath
(October 31, 2006)
Master Suite with Rainbow
(October 31, 2006)
Garage
(October 31, 2006)
Bedrooms
(October 31, 2006)
Clayton - 10-25 Field Report Item 1.10 (Garage back wall footing)
(October 30, 2006)
Placing Concrete in Wine Room / Pantry Area
(October 30, 2006)
View from Street Above
(October 30, 2006)
Guest Bedrooms / Baths in Foreground
(October 30, 2006)
Media Room to Right
(October 30, 2006)
Swimming Pool Spillway Formwork and Steel
(October 30, 2006)
Final Shaping of Lower Hillside
(October 30, 2006)
More Shaping...
(October 30, 2006)
...at Lower Hillside
(October 30, 2006)
Placing Concrete at Dining Area
(October 30, 2006)
Anchor Bolts Tied to Rebar Cage
(October 30, 2006)
Screeding Dining Area
(October 30, 2006)
Clayton - 10-25 Field Report Item 1.2
(October 27, 2006)
Clayton - 10-25 Field Report Item 1.3
(October 27, 2006)
Clayton - 10-25 Field Report Item 1.4
(October 27, 2006)
Clayton - 10-25 Field Report Item 1.5 Location #1
(October 27, 2006)
Clayton - 10-25 Field Report Item 1.5 Location #2
(October 27, 2006)
Clayton - 10-25 Field Report Item 1.5 Location #3
(October 27, 2006)
Clayton - 10-25 Field Report Item 1.6 North End
(October 27, 2006)
Clayton - 10-25 Field Report Item 1.6 South End
(October 27, 2006)
Clayton - 10-25 Field Report Item 1.7
(October 27, 2006)
Clayton - 10-25 Field Report Item 1.7
(October 27, 2006)
Clayton - 10-25 Field Report Item 1.8
(October 27, 2006)
Hillside Jute
(October 27, 2006)
Courtyard
(October 27, 2006)
Finishing Reinforcement at Wall by Gym
(October 26, 2006)
Anchor Bolts by Bed 4 - White Foam is for Rock Ledge
(October 26, 2006)
Added Stem Wall Reinforcement by Bed 3 and 4 per Clayton visit yesterday
(October 26, 2006)
Corner of Daughters' Bathrooms
(October 26, 2006)
Living Room
(October 26, 2006)
Fireplace Area to Left
Some Jute Installed on Our Portion of Upper Hillside beyond - waiting for more materials
(October 26, 2006)
Swimming Pool Reinforcement
(October 26, 2006)
Swimming Pool
(October 26, 2006)
Final Shaping of Driveway to Cottage
(October 26, 2006)
Drive up from Cottage
(October 26, 2006)
Drive down to Cottage
(October 26, 2006)
Still need to do Final Shaping of Lower Hillside
(October 26, 2006)
Hillside between Driveway and Palapa Area
(October 26, 2006)
Equipment Area Rock
(October 26, 2006)
Hillside Retaining Wall
(October 26, 2006)
Courtyard Area
(October 26, 2006)
Hillside Wall
(October 26, 2006)
Gym / Mechanical Room Concrete Reinforcement
(note: added 4 additional floor outlets to Gym Floor)
(October 11, 2006)
Gym / Mechanical Room / Guest Bedroom Steel Complete
(October 11, 2006)
Kitchen / Living Room
(October 11, 2006)
Kitchen
(October 11, 2006)
Breakfast Nook / Hall to Master Bedroom
(October 11, 2006)
Depressed Area for Master Tub
(October 11, 2006)
Master Tub
(October 11, 2006)
Master Shower
(October 11, 2006)
Stairs up to Master Suite
(October 11, 2006)
Front Door @ Courtyard
(October 11, 2006)
Looking at Cottage Area Below - Lower Wall Footing Excavated
(October 11, 2006)
Shaping Lower Hillside - Below Pool at Palapa Area
(October 11, 2006)
Footing for Upper Cottage Wall - Shaping Lower Hillside above
(October 11, 2006)
Shaping Lower Hillside - Standing at Cottage Area
(October 11, 2006)
Cleaning Up Rock Veneer - Large Pile of Extra Fill Material Removed
(October 11, 2006)
Beginning Final Shaping of Driveway to Cottage
(October 11, 2006)
Hillside above Cottage
(October 11, 2006)
Upper Hillside
(October 5, 2006)
Swimming Pool Forming
(October 5, 2006)
Temp Roadway Below Pool for Hauling Extra Material Out
(October 5, 2006)
Cottage Pad Area from Above
(October 5, 2006)
Equipment Area
(October 5, 2006)
Extra Fill Material to be Removed
(October 5, 2006)
Beginning Concrete Reinforcement in Living / Kitchen Area
(October 5, 2006)
Reinforcement at Hallway to Master Bed
(October 5, 2006)
Ready for Steel at Gym and Guest Bedrooms
(October 5, 2006)
Installing Steel @ Living Room
(October 5, 2006)
Garage
(October 5, 2006)
Previous photos
as of September 29, 2006
as of September 12, 2006
as of June 1, 2006
as of April 26, 2006
Design Board Story Pole - September 12, 2005