Dixon Homes, Inc.
our home page
Residence
Progress Through - 29 September, 2006




Tiki Torch location in Turnaround to left
Lower landscape wall getting veneer
(September 29, 2006)


Installing Vapor Barrier in Progress
(at Mech Room next to Gym)
(September 29, 2006)


Upper Wall
(September 29, 2006)


Upper Wall
(September 29, 2006)


Garage
(September 29, 2006)


Electrical Service side of Garage
(September 29, 2006)


Master Bath with Sunken Slab Area for New Tub
(September 29, 2006)


Master Shower Area
(September 29, 2006)


Pool
(September 29, 2006)


Pool
(September 29, 2006)


Pool
(September 29, 2006)


Dining and Kitchen
(September 29, 2006)


Master Bed
(September 29, 2006)


Upper Retaining Wall
(September 29, 2006)


Forming Swimming Pool Overflow Trough
(September 20, 2006)


Gas Line Manifold Behind Pool Vault
(September 20, 2006)


Gas Line Manifold Behind Pool Vault
(September 20, 2006)


Gas to Fireplace Area
(September 20, 2006)


Compacted Subbase in Living Room
(September 20, 2006)


Spa Area Below Pool
(September 20, 2006)


Gas Line in Trench
(September 20, 2006)


Gas Line by Master Suite
(September 20, 2006)


Master Bedroom
(September 20, 2006)


Propane to Emergency Generator Area
(September 20, 2006)


Downdraft Duct at Kitchen Island
(September 20, 2006)


Kitchen and Pool Edge Beyond
(September 20, 2006)


Garage and Office area Beyond
Strings Show Location of Wall Between Office and Hallway
(September 20, 2006)


Pool Edge when Standing in Living Room
(September 20, 2006)


Pool Edge when Standing in Kitchen
(September 20, 2006)


Plumbing in Kitchen
(September 20, 2006)

Previous photos

as of September 12, 2006
as of June 1, 2006
as of April 26, 2006
Design Board Story Pole - September 12, 2005