Progress Through - 12 September, 2006
Pool Equipment Vault in Foreground, Pool to Right
(September 12, 2006)
Pool Overflow Trough Area
(September 12, 2006)
Pool Overflow Trough Area and Equipment Area Beyond
(September 12, 2006)
Pool Excavation viewed up on Pool Deck
(September 12, 2006)
Trenching Complete for Gas Line to Fireplace and BBQ
(September 12, 2006)
Girl's Bathrooms - Looking East
(September 7, 2006)
Girl's Bathrooms - Looking South
(September 7, 2006)
Excavating Swimming Pool
(September 7, 2006)
Swimming Pool Entry
(September 7, 2006)
Swimming Pool
(September 7, 2006)
Digging for Cottage Area Retaining Walls
(September 7, 2006)
Final Shape of Upper Hillside
(September 7, 2006)
Upper Walls Backfilled, Swale Shaping
(September 7, 2006)
Above Equipment Area
(September 7, 2006)
Above Equipment Area
(September 7, 2006)
Master Bed Area
(September 7, 2006)
One 2" and Two 1" Pipes to Gate Area
(September 7, 2006)
Typical Floor Plug Box with 1" Pipe Connections
(September 7, 2006)
House Pad
(September 7, 2006)
Mech Room / Gym
(August 3, 2006)
Mech Room / Gym
(August 3, 2006)
Bed 4 and Bath 4
(August 3, 2006)
Garage
(August 3, 2006)
Mechanical Area - Wall Now Completely Grouted
(August 3, 2006)
Master Suite Beyond Wall
(August 3, 2006)
Courtyard
(August 3, 2006)
Trench for Gas Line from Propane Area to Generator Area
(August 3, 2006)
Entry Retaining Wall
(August 3, 2006)
Behind Retaining Wall
(August 3, 2006)
Equipment Area
(August 3, 2006)
Concrete Formwork for Master Suite to Left, Garage to Right
(August 3, 2006)
Garage
(August 3, 2006)
Master Bath
(August 3, 2006)
Master Suite and Hall to Living Room
(August 3, 2006)
Garage and Driveway Beyond
(August 3, 2006)
Garage (Large Trench in Foreground)
(August 3, 2006)
Powder Room
(August 3, 2006)
Cottage Pad Below
(August 3, 2006)
Master Bedroom Suite
(August 3, 2006)
Foundation Excavation - Standing in Media Room
(July 19, 2006)
Foundation Excavation
(July 19, 2006)
Foundation Excavation
(July 19, 2006)
Kitchen Area
(July 19, 2006)
Excavating Footings
(July 19, 2006)
Great Room
(July 19, 2006)
Excavating Footings
(July 19, 2006)
Retaining Wall in Progress
(July 19, 2006)
Hillside
(July 19, 2006)
Great Room to Right
(July 19, 2006)
Layout for Excavation
(July 10, 2006)
Upper Retaining Wall Footing
(July 10, 2006)
Upper Retaining Wall Footing
(July 10, 2006)
Drywell #1
(July 10, 2006)
Drywell #1
(July 10, 2006)
Drywell #2
(July 10, 2006)
Bath 4 Shower Corner
(June 16, 2006)
Gym and Mech Storage - Up to Porte Couchere
(June 16, 2006)
Mech Storage Area
(June 16, 2006)
Entertainment / Media Room
(June 16, 2006)
Circle is edge of Enclosed Great Room, Covered Lanai and Pool Beyond
(June 16, 2006)
Breakfast Nook
(June 16, 2006)
Powder Room / Pantry / Wine Hall looking towards Master Suite
(June 16, 2006)
Looking to Great Room from Dining Area
(June 16, 2006)
Top of Stairs at Hall 1
(June 16, 2006)
Master Bed
(June 16, 2006)
Master Bed - Trim Trees for view of Lanai
(June 16, 2006)
Master Bed
(June 16, 2006)
Corner of Master Bed
(June 16, 2006)
Master Toilet / Tub Area / Edge of Sauna at Left
(June 16, 2006)
Master Bath Looking Southwest
This soil still needs to moved for road construction down to cottage
(June 16, 2006)
Master Bath looking West
(June 16, 2006)
Master Bed in Foreground, Bath Beyond
(June 16, 2006)
Hillside
(June 16, 2006)
Cottage Area
(June 16, 2006)
Looking Up Hillside from Cottage
(June 16, 2006)
Cottage Area
(June 16, 2006)
Hillside - Temporary Road to Cottage
Final Roadway Centerline is off to Right of this Photo
(June 16, 2006)
Cottage Roadway Survey in Distance at Right
(June 16, 2006)
Dust Fence at top of Hillside
(June 16, 2006)
Silt Fence at Lower Property Boundary
(June 16, 2006)
Layout for Cottage Walls and Roadway
(June 16, 2006)
Precast Concrete Drywells - Most Delivered (12 rings total, 8 received)
(June 15, 2006)
Each Drywell Section is 8' wide and 4' high
(June 15, 2006)
Added Conduit for Gate Controls per Randy Gay Site Meeting
(1 1/2" Power for Gate Motor not yet Installed)
(June 15, 2006)
Building Pad from Street Above
(June 15, 2006)
Compacting Footing for Retaining Wall
(June 15, 2006)
Retaining Wall - Tripod in Distance is Mech Equipment Areas
(June 15, 2006)
All Building Edges Marked on Ground - Garage Area in Foreground, Master Suite Beyond
Kapalua Layout Inspection Was Made Earlier this Week
(June 15, 2006)
Central Portion of House Pad - Right side Drain Pipes beyond in future Pool Area
(June 15, 2006)
Bedroom and Gym Wing of Home
(June 15, 2006)
Looking at Pad Area from Property Line Above
(June 15, 2006)
Porte Couchere Area from Above
(June 15, 2006)
Entry Drive from Above
(June 15, 2006)
Garage and Living from Above
(June 15, 2006)
Garage and Master Suite from Above
(June 15, 2006)
Equipment Area from Above
(June 15, 2006)
Future Courtyard Area from Above
(June 15, 2006)
Upper Hillside - Dust Control Piping is Along this Entire Hillside
(June 15, 2006)
Potable Waterline with Backflow Preventer
On the left is the permanent, large copper line to house and cottage
The PVC and backflow preventer on the right is temporary, meter is to the far right
The large PVC pipe in the foreground is from the irrigation meter for dust control
(June 15, 2006)
Irrigation Waterline - Currently used for Dust Control
(June 15, 2006)
Previous photos
as of June 1, 2006
as of April 26, 2006
Design Board Story Pole - September 12, 2005