Residence
Progress Through - 26 April, 2006
Filled area from Bottom of Lot
(April 26, 2006)
Looking across lower Property Line
(Cottage location by dust fence in distance)
(April 26, 2006)
Container up at Porte Couchere Height
Office to be relocated to lower level soon
(April 26, 2006)
Compacted Fill in Distance
Loose, new fill before compaction in foreground
(April 26, 2006)
Gravel Placed for Driveway Service Entrance
(April 26, 2006)
Looking Below from Driveway Area
(April 26, 2006)
Retaining Wall Area at Porte Couchere
(April 26, 2006)
Level Building Pad and Courtyard Area Getting Larger
(April 26, 2006)
Lifting Lower Portion of Lot Still in Progress
(April 19, 2006)
Lifting Lot
(April 19, 2006)
Lifting Lot
(April 19, 2006)
Lifting Lot
(April 19, 2006)
Cut Area Above
(April 19, 2006)
Unloading Steel for Walls
(April 19, 2006)
(April 19, 2006)
(April 19, 2006)
(April 19, 2006)
Property Pins
(April 19, 2006)
Property Pins
(April 19, 2006)
Property Pins
(April 19, 2006)
Property Pins
(April 19, 2006)
Property Pins
(April 19, 2006)
Property Pins
(April 19, 2006)
Property Pins
(April 19, 2006)
Property Pins
(April 19, 2006)
Property Pins
(April 19, 2006)
Lot from above
(April 14, 2006)
Transformer near Driveway
(April 14, 2006)
Painted Line is edge of Retaining Wall
(April 14, 2006)
Compacted Fill in Lower Area
(April 14, 2006)
Compacted Fill in Lower Area
(April 14, 2006)
Lower Area
(April 14, 2006)
Lower Fill Area
(April 14, 2006)
Neighbor's Lot Below
(April 14, 2006)
Standing Near Finished Driveway Height at Porte Couchere
(April 14, 2006)
Compactor Near Swimming Pool Area
(April 14, 2006)
Storage Container relocated on Fill placed near Entry
(Soils Engineer on Site)
(April 10, 2006)
Material Being moved from Upper to Lower Part of Lot
(April 10, 2006)
Material Being moved from Upper to Lower Part of Lot
(April 10, 2006)
More of Same
(April 10, 2006)
Storage Placed on Fill Area
(April 10, 2006)
Silt Fence Below
(Dirt on Cul-De-Sac below from Runoff from Phase II last week)
(April 10, 2006)
Construction Entry still under Construction
(April 10, 2006)
Place Fill at Storage Area
(April 7, 2006)
Street Below
(April 7, 2006)
Moving Fill to Lower Portion of Lot
(April 7, 2006)
Grading
(April 7, 2006)
Grading
(April 7, 2006)
Grading Permit Received - Begin Grading
(Waterline for Dust Control Installed)
(April 3, 2006)
Driveway Entry Area
(April 3, 2006)
Dirt on Street from Phase II Runoff
(Heavy rains for the past week at jobsite)
(April 3, 2006)
Lot from Cul-De-Sac below
(April 3, 2006)
Lot below from Top of Street
(April 3, 2006)
Previous photos
Design Board Story Pole - September 12, 2005